Summary | : | Construction of Earthwork of Mahan Main Canal from RD 28.56Km. to RD 57.05Km., including its Minor Canal from Minor No.10 (at RD 18.350Km.) to Minor No.32. |
Status | : | Project Completed |
Location | : | Mahan Canal Division, Sidhi, Madhya Pradesh |
Cost | : | ₹ 90.90 Crores. |
Client/Dept. | : | The Executive Engineer, Water Resources Department Mahan Canal Division, Sidhi (Madhya Pradesh). |
Nature | : | Sub-contract (Approved by Govt. of Madhya Pradesh). |
Prime Contractor | : | HES Infra Pvt Ltd., Hyderabad. |
Summary | : | Cement Concrete Lining with Paver Machine from RD 0.00km to 22.91km of Mahan Main Canal. |
Status | : | Ongoing Project |
Location | : | Ganga Basin WRD Mahan Project, Sidhi, Madhya Pradesh. |
Cost | : | ₹ 31.40 Crores. |
Client/Dept. | : | The Chief Engineer, Water Resources Dept., Mahan (Gulab Sagar) Project Ganga Basin, Rewa (MP). |
Nature | : | Sub Contract (Approved by Govt. of MP). |
Prime Contractor | : | SARALA PROJECT WORKS Pvt Ltd., Hyderabad. |
Summary | : | Construction of Seoni Branch Canal from “R.D. 0.00M to R.D. 59220M. |
Status | : | Ongoing Project |
Location | : | Pench Diversion Project, Chindwara Dist. Madhya Pradesh. |
Cost | : | ₹ 145.50 Crores. |
Client/Dept. | : | The Executive Engineer, Water Resources Dept. Pench Diversion Project Canal Division,Singna Tah. Chourai, Dist. Chindwara, Madhya Pradesh. |
Nature | : | Joint Venture (Executed wholly by Mantena). |
Prime Contractor | : | SARALA-Mantena MP JV., Hyderabad. |
Summary | : | Construction of Upper Tilwara Canal from RD 0.00km to RD 15.00km and its distribution Network. |
Status | : | Project Completed |
Location | : | Tilwara Left Bank Canal Division Keolari, Seoni. |
Cost | : | ₹ 20.70 Crores. |
Client/Dept. | : | The Executive Engineer, Water Resources Dept., Tilwara L.B.C Division, Keolari, Dist. Seoni. |
Nature | : | Joint Venture. |
Prime Contractor | : | HES Mantena MP JV., Hyderabad. |
Summary | : | Construction of Majhagawan Branch Canal and its distribution network from RD 0.00km to RD 53.89km, off taking at taking at RD 91.800km of Purwa Main Canal. |
Status | : | Ongoing Project |
Location | : | Bansagar Project, Majhagawan Branch Canal, Near Satna, Madhya Pradesh. |
Cost | : | ₹ 133.50 Crores. |
Client/Dept. | : | The Executive Engineer, Water Resources Dept., Purwa Canal Division No. 2, Satna, Dist. Satna (MP) 485001. |
Nature | : | Joint Venture. |
Prime Contractor | : | SARALA – Mantena MP JV., Hyderabad. |
Summary | : | Construction of Tamas Main Canal RD 9.6km to 53.340km, Mahana distributory 0.00km to 6.678km, Chilla Branch Canal from RD 0.00km to 28.320km and their distribution network. |
Status | : | Ongoing Project |
Location | : | Bansagar Project, Teonthar Flow Scheme. |
Cost | : | ₹ 225.79 Crores. |
Client/Dept. | : | The Executive Engineer, Land Acquisition & Rehabilitation, Division No.1 Rewa (MP). |
Nature | : | Sub Contract (Approved by Govt. of MP). |
Prime Contractor | : | HES Infra Pvt Ltd., Hyderabad. |
Summary | : | Construction of Bahari Canal Network Under Phase II of Gulab Sagar (Mahan) Project for irrigation of 7500 Ha.Command area including running maintenance & testing of whole canal system for one year together with defect liability period of 36 months. |
Status | : | Ongoing Project |
Location | : | Mahan Canal Division Sidhi, Dist.Sidhi , Madhya Pradesh. |
Cost | : | ₹ 84.99 Crores. |
Client/Dept. | : | The Executive Engineer, Water Resources Department, Mahan Canal Division Sidhi, Dist-Sidhi, Madhya Pradesh. |
Prime Contractor | : | MANTENA INFRA. |
Summary | : | Construction of Earthwork of Main Khaddi Lift Canal from RD 1.925km to 20.845km. |
Status | : | Project Completed |
Location | : | Mahan Project, Sidhi, Madhya Pradesh. |
Cost | : | ₹ 30.07 Crores. |
Client/Dept. | : | The Chief Engineer, Water Resources Dept., Ganga Basin, Rewa (Madhya Pradesh). |
Nature | : | Sub-contract (Approved by Govt. of Madhya Pradesh). |
Prime Contractor | : | SARALA PROJECT WORKS PVT LTD., Hyderabad. |
Summary | : | Construction of Teonther lift canal including its distribution network up to 40 Hectors, Chak from RD 0.00km. to RD 23.00km. |
Status | : | Project Completed |
Location | : | Bansagar Project, Rewa, Madhya Pradesh. |
Cost | : | ₹ 94.80 Crores. |
Client/Dept. | : | The Executive Engineer, Land Acquisition & Rehabilitation, Division No.1 Rewa (H.Q.Teonther). |
Nature | : | Sub-contract (Approved by Govt. of Madhya Pradesh). |
Prime Contractor | : | HES Infra Pvt Ltd., Hyderabad. |
Summary | : | Construction of 16 nos, minor of Right Bank main Canal Dhamaniya Distributory 0.00km to 13.20km & Tail Distributory 0.00km to 51km, length may vary to achieve optimum command area including 755 nos, Hydraulic, road structures & aquaduct as per Topographical requirement, lining of Dhamaniya (0.00km to 13.20km) & Tail Distributory (0.00km to 51km). |
Status | : | Project Completed |
Location | : | W.R.D, Near Chindwara, Madhya Pradesh. |
Cost | : | ₹ 76.50 Crores. |
Client/Dept. | : | The Executive Engineer, Pench Diversion Project Canal Division, Singna Tah. Chourai, Dist. Chindwara, Madhya Pradesh. |
Nature | : | Sub-contract (Approved by Govt. of Madhya Pradesh). |
Prime Contractor | : | HES INFRA Pvt Ltd., Hyderabad. |