Expertise
Highways & Bridges
^
Summary |
: |
Construction of Major High Level Bridge along with its approaches across river Godavari near Sironcha in Gadchiroli Dist. |
Status |
: |
Project Completed |
Location |
: |
Sironcha, Gadchiroli, Maharashtra. |
Cost |
: |
₹ 242.88 Crores. |
Client/Dept. |
: |
PWD, Govt. of Maharashtra (M.O.R.TH, New Delhi). |
Nature |
: |
Sub-contract (Approved by Govt. of Maharashtra). |
Prime Contractor |
: |
HES Infra Pvt Ltd., Hyderabad. |
Summary |
: |
Construction of Major Bridge with Approaches across Pranhita river at Km.57/300 on NH-63(16)in Sironcha Tahasil, district Gadchiroli, Maharashtra.(Interstate border of Maharashtra and Telangana State). |
Status |
: |
Project Completed |
Location |
: |
Repanpalli, Chennur Mandal, Adilabad Dist., Telangana State. |
Cost |
: |
₹ 107.89 Crores. |
Client/Dept. |
: |
Ministry of Road Transport & Highways (M.O.R.T.H, New Delhi), P.W.D., Govt of Maharashtra. |
Prime Contractor |
: |
MANTENA VASISHTA NH JV. |
Summary |
: |
Rehabilitation and up-gradation of section from Km 242.0 to Km 298.0 of NH-223 (New NH-4) to 2-Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands on EPC Basis (Package-II). |
Status |
: |
Ongoing Project |
Location |
: |
Andaman and Nicobar Islands. |
Cost |
: |
₹ 259.00 Crores. |
Client/Dept. |
: |
The Managing Director, NHIDCL, 3rd Floor, PTI Building , Sansad Marg, New Delhi, India. |
Nature |
: |
JOINT VENTURE (A Joint Venture of Vasishta Constructions Pvt Ltd and Mantena Infra LLP). |
Prime Contractor |
: |
VASISHTA MANTENA NH JV. |
Summary |
: |
Construction of Major Bridge over Middle Strait Creek between Km. 106.590 to Km. 107.762 of NH-223 (New No.- NH-4) connecting South Andaman & Baratang Islands in the Union Territory of Andaman & Nicobar Islands. |
Status |
: |
Ongoing Project |
Location |
: |
Andaman and Nicobar Islands. |
Cost |
: |
₹ 170.40 Crores. |
Client/Dept. |
: |
The Managing Director, NHIDCL, 3rd Floor, PTI Building , Sansad Marg, New Delhi, India. |
Nature |
: |
JOINT VENTURE (A Joint Venture of Mantena Infrasol Pvt Ltd., and Vasishta Constructions Pvt Ltd.). |
Prime Contractor |
: |
MANTENA VASISHTA BRIDGE JV. |
Summary |
: |
Rehabilitation and up-gradation of section from Km 107.760 to Km 129.445 (After Middle strait to Humphrey), K 130.600 to Km 138 (After Humphrey to Kadamtala) & Km 155.00 to Km 181.00 (End of Jarwa to Rangat) of NH-4 (Total length: 54.71 Km) to 2-Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands. |
Status |
: |
Ongoing Project |
Location |
: |
Andaman and Nicobar Islands. |
Cost |
: |
₹ 298.00 Crores. |
Client/Dept. |
: |
The Managing Director, NHIDCL, 3rd Floor, PTI Building , Sansad Marg, New Delhi, India. |
Nature |
: |
JOINT VENTURE (A Joint Venture of Mantena Infrasol Pvt Ltd., and Vasishta Constructions Pvt Ltd.). |
Prime Contractor |
: |
MANTENA VASISHTA STRAIT JV. |